Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | HDPARTS |
Model Number : | C6.6 C7.1 |
Price : | Looking forward to your inquiry |
Payment Terms : | T/T, Western Union, MoneyGram,HSBC |
Supply Ability : | 1000 Piece/Pieces per Month |
Delivery Time : | 2-5 work days |
C6.6 C7.1 Diesel Engine Pump 322-9662 4131A068 For CATERPILLAR
Specification
Applicable models | C6.6 C7.1 |
Type | Water Pump |
Original number | 322-9662 4131A068 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Precautions for water pump | When the bottom valve of the water pump leaks, some people will fill the inlet pipe of the water pump with dry soil and flush it with water, which is really not advisable. Because when the dry soil is put into the water inlet pipe, when the pump starts to work, the dry soil will enter the pump, which will damage the pump impeller and bearing, thus shortening the service life of the pump. When the bottom valve leaks, it must be repaired. If it is serious, it needs to be replaced. |
Introduction to water pump | Water pump is a kind of machinery to transport liquid or pressurize liquid. |
Product Description
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery
parts market in 1995. It is located in the center of the world's
largest industrial distribution center.
is supported by scientific research and development strength, new
business philosophy, mature marketing team, development and sales
of high quality excavator parts.
covers a wide range, and its products are characterized by high
strength, high toughness, high temperature resistance, no
deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage
parts, General consumable parts, Engine spare parts, and stuff like
that which are high-qualified products.
The product matching different kinds of excavator spare parts,
which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
![]() |