Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | HDPARTS |
Model Number : | YZ4BD1 |
Price : | Looking forward to your inquiry |
Payment Terms : | T/T, Western Union, MoneyGram,HSBC |
Supply Ability : | 1000 Piece/Pieces per Month |
Delivery Time : | 2-5 work days |
YZ4BD1 Piston ring YZ4105ZLQ Suitable For Diesel engines parts
Specification
Applicable models | YZ4BD1 |
Type | Piston ring |
Original number | YZ4105ZLQ |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
characteristic | ▪ Force ▪ Thermal conductivity ▪ Airtightness ▪ Oil control ▪ Supportability |
usage | Good and bad identification The working surface of the piston ring shall not be nicked, scratched or peeled off. The outer cylindrical surface and the upper and lower end faces shall have a certain finish. The curvature deviation shall not be greater than 0.02-0.04 mm. The standard settlement of the ring in the groove shall not exceed 0.15-0.25 mm. The elasticity and clearance of the piston ring shall meet the requirements |
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery
parts market in 1995. It is located in the center of the world's
largest industrial distribution center.
is supported by scientific research and development strength, new
business philosophy, mature marketing team, development and sales
of high quality excavator parts.
covers a wide range, and its products are characterized by high
strength, high toughness, high temperature resistance, no
deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage
parts, General consumable parts, Engine spare parts, and stuff like
that which are high-qualified products.
The product matching different kinds of excavator spare parts,
which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
![]() |